One-stop capability for engineered solutions

While each company in the Timberland Group has nurtured unique capabilities to serve its specialized markets, all reflect a shared commitment to engineering excellence, quality manufacturing and outstanding customer service. Sharing expertise and resources throughout our organization, our teams bring together best-in-class experience in:

  • Application expertise
  • Heavy equipment engineering
  • Hydraulics design and PLC control
  • Heavy manufacturing
  • Field service and maintenance support
  • Turnkey project support

Our “one-stop” philosophy simplifies customers’ procurement of engineered solutions by bringing all phases of development and delivery under one roof, one responsibility. Our end-to-end view of customer projects, from design concept to lifelong support, allows us the vision and experience to bring innovative ideas to life.

Visit our projects library for more insight into how Timberland solutions have created new opportunities for productivity and profitability for our customers in every field.

 

Projects

San Francisco - Oakland Bay Bridge

This bridge reconstruction project called for safely lifting and positioning massive 750-ton precast bridge segments delivered on barges.

Highline Lift System

The Hoover Dam Bypass urgently needed a fast-track replacement for its highline lift system after its original cranes were swept away by gusting winds.

Kiewit Heavy Lift Device

The Kiewit HLD in Texas relies on precise synchronization of multiple hoists to safely handle loads of up to 13,000 tons.

FPSO Tower Mooring and Loading System

Effective project coordination resulted in a successful deep-water deployment in China’s Bohai Bay oil field.

P-56 Riser Pull-In and Mooring Tensioning

Sophisticated control systems provide this FPU with highly reliable automatic self-correcting operation.

Bisso Marine Towing System

Integrating a new double-drum towing winch and controls into this 2400 HP tugboat required a close fit with available deck space and hydraulics.

Zhangji Mine Emergency Egress

This truck-mounted MRH emergency egress system allows dramatically faster response to maintenance problems deep in the Zhangji Mine in China.

Jiangsu Power Puller & Tensioner

Jiangsu Power Company was able to erect a 500 kV transmission line through rugged central China with our 28-ton puller and 20-ton tensioner.

Puller-Tensioner Reconductor System

This versatile all-in-one solution minimizes the amount of equipment needed to upgrade electrical distribution lines in confined work areas.

2-bundle + OPGW stringing in Costa Rica

The custom engineered puller-tensioner system from Timberland included a trailer-mount able to travel at highway speeds.

Diavik Diamond Mine - NWT

Marcotte expedited delivery of equipment for new underground operations before ice roads to the mine melted with the Spring thaw.

News

Hawboldt - Inshore Science Vessels
<More>


Hawboldt - Deck Equipment, Mid-Shore Patrol Vessels
<More>


Tools

Customer file exchange

DCRC Derrick Capacity & Reaction Calculator

QuikPik tensioning equipment selector (International)

QuikPik tensioning equipment selector (US)

Winch Questionnaire